Only the Official Contractor is authorised to carry out electrical works from the main power supply within the exhibition hall.
Important Notes:
- Please ensure that spotlight positions are marked on the wall or fascia, unless your stand includes an interior structure suitable for mounting.
- If a location/layout plan is not submitted with the order form before the deadline, the Official Contractor reserves the right to determine the placement of utilities at their discretion.
- Submit orders only for additional requirements beyond the standard provisions. The Standard Shell Scheme Package includes one (1) 13Amp/230V SP 50Hz AC Socket and two (2) 40W Fluorescent Lights. Kindly order only your additional requirements
- Orders will be confirmed only upon receipt of full payment.
- No cancellations allowed once the order is submitted.
- Late orders received after the deadline are subject to availability.
- A 30% surcharge (Standard Rate) applies to orders received after 12 August 2026.
- A 50% surcharge (On-site Rate) applies to orders received after 27 September 2026.
Image | Name | Description | Price | Quantity | Add to cart |
|---|---|---|---|---|---|
$85.00 | Max: Min: 1 Step: 1 | ||||
$95.00 | Max: Min: 1 Step: 1 | ||||
$65.00 | Max: Min: 1 Step: 1 | ||||
$95.00 | Max: Min: 1 Step: 1 | ||||
$210.00 | Max: Min: 1 Step: 1 | ||||
$210.00 | Max: Min: 1 Step: 1 | ||||
$95.00 | Max: Min: 1 Step: 1 | ||||
$180.00 | Max: Min: 1 Step: 1 | ||||
$140.00 | Max: Min: 1 Step: 1 | ||||
$75.00 | Max: Min: 1 Step: 1 | ||||
$140.00 | Max: Min: 1 Step: 1 | ||||
$210.00 | Max: Min: 1 Step: 1 | ||||
$75.00 | Max: Min: 1 Step: 1 |
***Important Note***
Light boxes are charged based on the number of tubes in each light box, the light connection or 40W fluorescent tube rate, whichever is applicable.
If light fittings are provided by the exhibitors, the connection charges for lighting will be based on the number of bulb/tube. In the case where light boxes are pre-installed with light fittings, the official contractor reserves the right to charge connection based on assumption of 5nos. of 1mL fluorescent tubes per meter.
All electrical connection to equipment must be tested and approved by the Organizer’s appointed licensed engineer prior to turning on the power supply. The Organizer reserves the right to terminate the power supply to any installation deemed dangerous or may cause disruption to the power supply.
