This Form must be completed and returned by all Shell Scheme stand Exhibitors (Please type in block letters)

  • Only the Official Contractor is authorised to carry out electrical works from the main power source within the exhibition hall.
  • To ensure accurate installation, please clearly indicate the locations of all electrical items on this form which will be used to install your electrical requirements at the specified locations.
  • Please ensure that all light fixtures are positioned on the wall or fascia, unless your booth includes an internal structure suitable for mounting.
  • If the electrical location plan is not submitted before the deadline, the Official Contractor reserves the right to determine the placement of electrical items. Additional charges will apply for any re-location requests.
  • To indicate placement, click on the electrical icons and drag them onto the layout chart below.
Back Wall
Side Wall/Open
Side Wall/Open
Open Front

***Important Note***

  • Light boxes are charged based on the number of tubes in each light box, the light connection or 40W fluorescent tube rate, whichever is applicable.

  • If light fittings are provided by the exhibitors, the connection charges for lighting will be based on the number of bulb/tube. In the case where light boxes are pre-installed with light fittings, the official contractor reserves the right to charge connection based on assumption of 5nos. of 1mL fluorescent tubes per meter.

  • All electrical connection to equipment must be tested and approved by the Organiser’s appointed licensed engineer prior to turning on the power supply. The Organiser reserves the right to terminate the power supply to any installation deemed dangerous or may cause disruption to the power supply.